AZUSA & GLENDORA, CA
WKE staff prepared the PS&E and completed the PUC application approval for the construction of the railroad grade separation structures at Citrus Avenue in the city of Azusa and Palm Drive in the city of Glendora. WKE designed the vertical and horizontal realignment of the existing track to be placed at the ultimate location upon completion of the grade separation structures.