LOS ANGELES, CA
WKE was responsible for the design and computer modeling of the approach trestles and support piers for the 220-foot long main lift span structures over the Cerritos Channel for Port of Los Angeles. The structure replaces the existing Strauss Trunnion Bridge and includes 180-foot high main towers.