Fairway Drive Grade Separation

CITY OF INDUSTRY, CA

WKE is currently preparing the PS&E for this structure which separates the operation of Fairway Drive from the existing Union Pacific tracks. The project includes the new railroad bridge with associated retaining wall structures, the depression of portions of Business Parkway and Walnut Drive, and maintains access to adjacent businesses and public facilities.

DONT CHANGE

Contact

Call us: 714-953-2665

Fax: 714-953-5408

Email: info@wke-inc.com

1851 East First Street
Suite 1400
Santa Ana, CA 92705